首页> 美国政府科技报告 >Interim Response Action, Basin F Liquid Incineration Project, Submerged QuenchIncinerator, Startup Plan
【24h】

Interim Response Action, Basin F Liquid Incineration Project, Submerged QuenchIncinerator, Startup Plan

机译:临时响应行动,F区液体焚烧项目,淹没式QuenchIncinerator,启动计划

获取原文

摘要

The objective of the startup plan is to describe the procedures that will be usedto prepare the SQI system equipment to a point of operational readiness. This document discusses planned activities from mechanical completion of the SQI facility through testing of the system prior to the trail burn. The major components of the startup process include equipment checkout, surrogate testing, and shakedown testing. This plan does not discuss operating procedures relating to starting the SQI facility.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号