首页> 美国政府科技报告 >PART I: Bioventing Pilot Test Work Plan for Fire Protection Training Area Site FY-03, Charleston AFB, South Carolina. PART II: Draft Interim Pilot Test Results Report for Fire Protection Training Area Site FT-03, Charleston AFB, South Carolina
【24h】

PART I: Bioventing Pilot Test Work Plan for Fire Protection Training Area Site FY-03, Charleston AFB, South Carolina. PART II: Draft Interim Pilot Test Results Report for Fire Protection Training Area Site FT-03, Charleston AFB, South Carolina

机译:第一部分:南卡罗来纳州查尔斯顿空军基地FY-03消防培训区生物风化试验工作计划。第二部分:南卡罗来纳州查尔斯顿空军基地FT-03消防培训区域临时试点测试结果报告草案

获取原文

摘要

This site-specific work plan presents the scope of a bioventing pilot test for in situ treatment of fuel contaminated soils at the Fire Protection Training Area designated as Site FT-O3, Charleston Air Force Base (AFB), South Carolina. The proposed pilot test has three primary objectives: (1) to assess the potential for supplying oxygen throughout the contaminated soil depth, (2) to determine the rate at which indigenous microorganisms will degrade the fuel hydrocarbons in the soil when stimulated by oxygen-rich soil gas, and (3) to evaluate the potential for sustaining these rates of biodegradation until fuel contamination is remediated to concentrations below regulatory standards.

著录项

相似文献

  • 外文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号