首页> 外文期刊>Southwest Contractor >Building in the Fast Lane--State Route 202 Expansion Poised for Early Completion
【24h】

Building in the Fast Lane--State Route 202 Expansion Poised for Early Completion

机译:在快车道上建造-202号州际公路扩张计划尽早完成

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The State Route 202 expansion project in Phoenix and its suburbs is heading for early completion. The 188-million dollars reconstruction of SR 202-an integrated joint venture of lead partner Kiewit Corp.'s Phoenix office and Sundt Construction of Tempe for the Arizona Dept. of Transportation-adds a 10-mi eastbound through-lane and auxiliary lanes between Interstate 10/State Route 51 and State Route 101 and a 2-mi westbound through-lane and auxiliary lane between SR 101 and Scottsdale Road. Designed by San Francisco-based URS Corp., the design-build project also directs the Kiewit/Sundt team to manage traffic control during construction; widen the roadways and 22 bridges including the 1-mi-long Salt River bridges; reconstruct ramps; build noise and retaining walls; modify the drainage system; complete landscaping; and install an updated freeway management system.
机译:凤凰城及其郊区的202号州际公路扩建项目即将提前完工。 SR 202的1.88亿美元重建工程,是主要合伙人Kiewit Corp.的Phoenix办事处和Tempd的Sundt Construction的合营企业,亚利桑那州交通运输部在该州之间增加了10英里的东行直通车道和辅助车道10号州际公路/ 51号州际公路和101号州际公路以及SR 101和斯科茨代尔路之间的2英里西行直行车道和辅助车道。该设计建造项目由总部位于旧金山的URS Corp.设计,还指导Kiewit / Sundt团队在施工期间管理交通控制。拓宽道路和22座桥梁,包括1英里长的Salt River桥梁;重建坡道;建造噪音和挡土墙;修改排水系统;彻底美化环境;并安装更新的高速公路管理系统。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号