首页> 外文期刊>SBB Steel Markets Daily >Fortescue powering ahead with Firetail ore deposit
【24h】

Fortescue powering ahead with Firetail ore deposit

机译:Fortescue用Firetail矿床推动动力

获取原文
获取原文并翻译 | 示例
           

摘要

Australia's third largest iron ore miner announced an 1.5 billion Australia dollars (1.56 billion dollars) five-year contract with Leighton Contractors to build a mine, associated infrastructure and ore handling plants at the site, which will take Firetail to 20 million mt/year output by the end of March 2013. Fortescue also recently commissioned the second train unloader at its Herb Elliot facility at Port Hedland.
机译:澳大利亚第三大铁矿石开采商宣布与Leighton Contractors签订为期五年的15亿澳元(15.6亿美元)合同,在该厂建设矿山,相关基础设施和矿石处理厂,这将使Firetail的年产量达到2000万吨到2013年3月底,Fortescue最近还委托了位于黑德兰港的Herb Elliot工厂的第二台火车卸车机。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号