Scheduling small number of quay cranes with non-interference constraint

机译:调度具有无干扰约束的少量码头起重机

获取原文
获取原文并翻译 | 示例
           

摘要

Quay crane (QC) scheduling significantly affects the turn-around time of a container vessel, and it plays an important role in container terminal operation. Lee et al. (An approximation algorithm for quay crane scheduling with non-interference constraints in port container terminals, Presented at Tristan VI, Phuket, June 10-15, 2007) present a 2-approximation algorithm for QC scheduling problem with non-interference constraint. In this paper we revisit Lee's heuristic for the scenario with small number of QCs, and prove that it is 4/3 and 5/3-approximation for the case with two QCs and the case with three QCs respectively.
机译:码头起重机(QC)的调度会显着影响集装箱船的周转时间,并且在集装箱码头的运营中起着重要的作用。 Lee等。 (在港口集装箱码头中具有无干扰约束的码头起重机调度的近似算法,于2007年6月10日至15日在普吉岛的Tristan VI提出)提出了一种具有无干扰约束的QC调度问题的2种近似算法。在本文中,我们重新审视了针对具有少量QC的情形的Lee启发式方法,并证明了对于具有两个QC的情况和具有三个QC的情况,分别为4/3和5/3近似。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号