Four novel components of a reelable pipe-in-pipe flowline system were installed in BP PLC's Nile project in the US Gulf of Mexico in January 2001. Presented here are details of design and qualification testing for the insulation material, pipeline centralizers, buckle arrestors, and reelable water-stops.
展开▼