首页> 外文期刊>Railway Technical Review >The 'VAE ROADMASTER 2000' in the context of the Taiwan High-Speed Rail Project
【24h】

The 'VAE ROADMASTER 2000' in the context of the Taiwan High-Speed Rail Project

机译:台湾高铁项目中的“ VAE ROADMASTER 2000”

获取原文
获取原文并翻译 | 示例
           

摘要

The VAE ROADMASTER 2000 Turnout Monitoring System for the Taiwan High-Speed Rail Project is to monitor a total of 78 high-speed points over a distance of approximately 380 km. Several different types of points based on European technology are monitored, namely: JIS 60-10000/4000-1:33, JIS 60-4800/2450-1:26, JIS 60-3000/1500-1:18.132, JIS 60-1200-1:18.5, JIS 60-900-1:16, JIS 60-600-1:16 and JIS 60-300-1:9 ("JIS" is the Japanese profile corresponding to the UIC profile in Europe). The points in the range of 300-1:9 to 900-1:16 have fixed frogs, whereas those greater than 900-1:16 have movable frogs.
机译:用于台湾高铁项目的VAE ROADMASTER 2000道岔监测系统将在大约380公里的距离内监测总共78个高速点。根据欧洲技术对几种不同类型的点进行监视,即:JIS 60-10000 / 4000-1:33,JIS 60-4800 / 2450-1:26,JIS 60-3000 / 1500-1:18.132,JIS 60- 1200-1:18.5,JIS 60-900-1:16,JIS 60-600-1:16和JIS 60-300-1:9(“ JIS”是对应于欧洲UIC轮廓的日语轮廓)。 300-1:9到900-1:16范围内的点具有固定青蛙,而大于900-1:16的点具有活动青蛙。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号