Timing Calculations for Double Puller Systems in Aluminum Extrusion

机译:铝挤压双牵引系统的时序计算

获取原文
获取原文并翻译 | 示例
           

摘要

Many extruders do not appreciate the requirements imposed on the plant design when deciding to invest and install a double puller system. When a plant is to he installed on a greenfield site, the limitations of design pose no problems, but when equipment is to be installed in an existing building or retrofitted to an existing press, these limitations can be prohibitive. When asked why a double puller is needed, the extruder may answer; "We want the latest technology," or "We want to cut on the fly to eliminate the stop mark." These requirements are made without the realization that double pullers require long leadouts if the extrusion speed capability is to be exploited. Older plants are often limited in length by the dimensions of the building or the proximity of other equipment, and increases in initial table length can only be achieved at the expense of the runout. This may turn out to be unacceptably short.
机译:许多挤出机在决定投资并安装双牵引器系统时并不理解对工厂设计的要求。当工厂要安装在未开发的场地上时,设计的限制不会带来任何问题,但是当设备要安装在现有建筑物中或改装到现有压机时,这些限制可能会令人望而却步。当被问及为什么需要双牵引器时,挤出机可能会回答; “我们想要最新的技术,”或“我们想即时切入以消除停止标记。”提出这些要求时并没有意识到如果要利用挤出速度能力,则双拉拔器需要较长的引出线。较老的植物的长度通常受建筑物尺寸或其他设备附近的限制,并且初始工作台长度的增加只能以跳动为代价来实现。事实证明这可能太短了。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号