首页> 外文期刊>NGW's Gas Market Reconnaissance >The construction phase of the 205-MW Lakefield Wind Project has begun, with the wind farm expected to be operational in the fall of 2011
【24h】

The construction phase of the 205-MW Lakefield Wind Project has begun, with the wind farm expected to be operational in the fall of 2011

机译:205兆瓦Lakefield风力项目的建设阶段已经开始,预计该风电场将于2011年秋季投入运营

获取原文
获取原文并翻译 | 示例
           

摘要

Developed and owned by enXco, the Lakefield Wind Project, spans 20,000 acres of farmland near Lakefield, Minnesota. It consists of 137 1.5-MW turbines with the capacity to power more than 68,000 homes. Indianapolis Power and Light will purchase the power generated under a 20-year power purchase agreement.
机译:Lakefield Wind Project由enXco开发和拥有,在明尼苏达州Lakefield附近横跨20,000英亩的农田。它由137台1.5兆瓦涡轮机组成,能够为68,000多个家庭供电。印第安纳波利斯电力和照明将购买根据20年电力购买协议产生的电力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号