...
首页> 外文期刊>CAD user >Seeking Pole! - Formula 1 Subcontractor, JK Engineering Ltd invests in OPEN MIND CAD/CAM
【24h】

Seeking Pole! - Formula 1 Subcontractor, JK Engineering Ltd invests in OPEN MIND CAD/CAM

机译:求极! -JK Engineering Ltd.一级方程式分包商投资OPEN MIND CAD / CAM

获取原文
获取原文并翻译 | 示例
           

摘要

If you want to be at the leading edge of design and technology, you need look no further than Formula 1 racing Not only have the new rules forced manufacturers to rethink the designs of their cars dramatically, but shaving fractions of seconds off lap times means monitoring all aspects of performance throughout practice sessions and the actual races themselves No sooner are the cars off the track and back in their factories than the knowledge is put into practice with cars being substantially remodelled between Grand Prix races. They even take into account the venue for the next race, the special demands of its circuit, and the weather they are likely to get.
机译:如果您想在设计和技术方面处于领先地位,那么您只需要看一级方程式赛车就可以了。不仅新规则迫使制造商重新思考其汽车的设计,而且缩短了几分之一秒的圈速意味着监控整个练习过程中各个方面的表现以及实际比赛本身,赛车必须立即离开赛道,并回到自己的工厂,知识才能付诸实践,而赛车在两次大奖赛之间进行了实质性的改造。他们甚至考虑到下一站比赛的地点,赛道的特殊要求以及他们可能遇到的天气。

著录项

相似文献

  • 外文文献
  • 中文文献
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号