首页> 外文期刊>New steel >Saudi Arabia's Hadeed will build HYL III plant
【24h】

Saudi Arabia's Hadeed will build HYL III plant

机译:沙特阿拉伯的Hadeed将建设HYL III工厂

获取原文
获取原文并翻译 | 示例
       

摘要

The Saudi Iron and Steel Co. (Hadeed) will build an HYL Ill-process direct-reduced-iron (DRI) plant in Al-Jubail on the coast of the Persian Gulf. The plant will have an annual capacity of 1.1 million metric tons and begin production in the second half of 1998. Davy International is supplying engineering and construction. The new DRI plant will supply feedstock for a new flat-products mill Hadeed plans to build at its existing complex in Al-Jubail. The company currently operates three other DRI modules that supply its existing steel plants at that site. The new sheet mill is expected to begin operations in early 1999.
机译:沙特钢铁公司(Hadeed)将在波斯湾沿岸的Al-Jubail兴建HYL病态工艺直接还原铁(DRI)厂。该工厂的年产能为110万吨,并于1998年下半年开始生产。戴维国际公司正在提供工程和建设。新的DRI工厂将为Hadeed计划在其位于Al-Jubail的现有工厂建造的新的平板产品工厂提供原料。该公司目前运营着另外三个DRI模块,这些模块为该站点的现有钢铁厂提供产品。新的薄板厂预计于1999年初开始运营。

著录项

  • 来源
    《New steel》 |1996年第7期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 冶金工业;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号