...
首页> 外文期刊>Natural Gas Week. >Main Pass Offshore LNG Export Project Seeks Separate DOE Queue
【24h】

Main Pass Offshore LNG Export Project Seeks Separate DOE Queue

机译:Main Pass海上LNG出口项目寻求单独的DOE队列

获取原文
获取原文并翻译 | 示例
           

摘要

Freeport-McMoRan Energy (FME), developer of the Main Pass Energy Hub, wants the prospective LNG export project in a "separate and simultaneous" queue from the one that the US Department of Energy (DOE) is using to consider export applications to countries that do not have a Free Trade Agreement (FTA) with the US. FME is seeking long-term, multi-contract authorization to export up to 24 million tons of LNG per year (about 3.4 billion cubic feet per day) for 30 years from its proposed offshore terminal located about 17 miles east of the mouth of the Mississippi River. So far, India's Petronet LNG and a Pakistani company have each signed preliminary offtake agreements for 4 million tons/yr (0.55 Bcf/d) over 20 years via the project.
机译:Free Pass-McMoRan Energy(FME)是Main Pass Energy Hub的开发商,希望将潜在的LNG出口项目与美国能源部(DOE)用来考虑向其他国家/地区的出口申请“排成一列”。与美国没有自由贸易协定(FTA)的国家。 FME正在寻求长期的多合同授权,以从其位于密西西比河口以东约17英里的拟建海上码头,每年出口多达2400万吨LNG(每天约34亿立方英尺),为期30年。河。到目前为止,印度的Petronet LNG和一家巴基斯坦公司已通过该项目签署了为期20年的400万吨/年(0.55 Bcf / d)的初步承购协议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号