...
首页> 外文期刊>Natural gas intelligence >Canada Regulatory Overhaul Fast-Tracks NatGas, LNG, Pipe Projects
【24h】

Canada Regulatory Overhaul Fast-Tracks NatGas, LNG, Pipe Projects

机译:加拿大监管大修快速跟踪NatGas,LNG,管道项目

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

An efficiency overhaul of Canada’s energy and environment regulatory apparatus, by legislation currently before Parliament in Ottawa, is coming just in time for the country’s chief oil, gas and power watchdog. “In the coming year we expect to see a record number of applications,” National Energy Board (NEB) Chairman Gaetan Caron says in a 2012-13 Report on Plans and Priorities, presented to the House of Commons as part of its annual budget debate. The “unprecedented increase in industry applications” is currently expected to include 27 major projects in fields from exploration on federally controlled territory to pipelines and power transmission.
机译:根据加拿大渥太华国会目前的立法,对加拿大能源和环境监管机构进行的效率改革正赶上加拿大主要的石油,天然气和电力监管机构。国家能源委员会(NEB)主席加坦·卡隆(Gaetan Caron)在2012-13年计划和优先级报告中说:“预计明年,我们将看到创纪录的申请数量。” 。目前,“行业应用的空前增长”预计将包括27个重大项目,涉及从联邦控制领土上的勘探到管道和输电等领域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号