首页> 外文期刊>Measurement >Measurement of fusible elements during current interruption and interoperation of related phenomena
【24h】

Measurement of fusible elements during current interruption and interoperation of related phenomena

机译:在电流中断和相关现象互操作期间测量易熔元件

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The physicochemical process that occurs during the operation of fuse elements under excessive or heavy fault currents is complex and not well understood. In this paper, measurements obtained using analog/digital (A/D) converters are presented and the observed phenomena are investigated. Multiple arcing and a short-duration lowering of the voltage drop are explained, and interpretations of related phenomena during short-circuit are presented.
机译:在过大或过大的故障电流下,在保险丝元件工作期间发生的物理化学过程是复杂的,尚未得到很好的理解。本文介绍了使用模拟/数字(A / D)转换器获得的测量结果,并对观察到的现象进行了研究。解释了多次电弧放电和电压降的短期降低,并给出了短路期间相关现象的解释。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号