Procedures for consideration of dredging applications in the Severn Estuary were noted by Gloucestershire CC in May. A significant part of the Severn Estuary falls within the administrative control of the County Council, upstream of the mouth of the River Wye at Sedbury, within areas that are contiguous with the foreshore extending to the line of mean low water. As MPA it would have responsibility for the determination of any proposals for minerals development which might be submitted in this area. Pre-application discussion has taken place with regards to possible proposals for dredging in the estuary. However, the Minerals Local Plan is not explicit in providing a policy framework for these issues. Accordingly a policy approach for the consideration of any dredging proposal was recommended.
机译:格洛斯特郡CC于5月指出了考虑在Severn河口进行挖泥作业的程序。塞文河口的很大一部分属于县议会的行政管理范围,在塞德伯里怀伊河河口的上游,在与前陆相连并延伸至平均低水位线的区域内。作为MPA,它将负责确定可能在该领域提交的任何矿产开发建议。关于在河口挖泥的可能建议,已经进行了应用前的讨论。但是,矿产地方计划在提供针对这些问题的政策框架时并未明确。因此,建议采取政策方法来考虑任何疏dr建议。

著录项

  • 来源
    《Mineral Planning》 |2002年第92期|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号