首页> 美国政府科技报告 >New Bedford Harbor Superfund Project, Acushnet River Estuary Engineering Feasibility Study of Dredging and Dredged Material Disposal Alternatives. Report 3. Characterization and Elutriate Testing of Acushnet River Estuary Sediment
【24h】

New Bedford Harbor Superfund Project, Acushnet River Estuary Engineering Feasibility Study of Dredging and Dredged Material Disposal Alternatives. Report 3. Characterization and Elutriate Testing of Acushnet River Estuary Sediment

机译:新贝德福德港超级基金项目,acushnet河口工程疏浚和疏浚物料处置替代方案的工程可行性研究。报告3. acushnet河口河口沉积物的表征和Elutriate测试

获取原文

摘要

Several of the alternatives being considered for the New Bedford Harbor Superfund Project involve dredging of contaminated sediment from the Acushnet River Estuary and placement of the contaminated dredged material in confined disposal areas. Evaluation of these alternatives requires testing sediment from the site to determine chemical and physical characteristics, settling properties, contaminant releases for various migration pathways, and treatment requirements for disposal area effluent. The purpose of this report is to describe the estuary composite sediment sample and the hot spot sediment sample tested at the US Arym Engineer Waterways Experiment Station as part of the US Army Corps of Engineers' Acushnet River Estuary Engineering Feasibility Study of Dredging and Dredged Material Disposal Alternatives. Bulk sediment chemistry, physical characteristics, and elutriate testing for the sediments are included. Contaminant, Dredged material, Dredging, Elutriate, Metals, New bedford harbor, PCB, Sediment, Superfund. (mjm)

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号