首页> 外文期刊>Gold & Minerals Gazette >Aggressive work program planned for tungsten play
【24h】

Aggressive work program planned for tungsten play

机译:钨矿开采计划激进工作计划

获取原文
获取原文并翻译 | 示例
           

摘要

Vital Metals Ltd's wholly owned Watershed scheelite project in far north Queensland could be in production by the end of 2008 at the earliest, but most likely by the first half of 2009. The company aims to initially produce a concentrate product comprising 4,000 tonnes of contained tungsten oxide per annum, with a mine life of at least 10 years. If achieved, this would represent about 7 percent of the entire global usage of the commodity, ranking it among the largest such mines in the world. The Watershed deposit was discovered by Utah Development Company in 1978 and was extensively explored by that company until 1985. According to Vital chairman and executive director Bill Ryan, Utah walked away from the project principally because China had "wiped out the tungsten market" by the mid 1980s.
机译:Vital Metals Ltd在昆士兰州最北端的全资分水岭白钨矿项目最早可能在2008年底投入生产,但很可能在2009年上半年投入生产。该公司的目标是最初生产包含4,000吨钨的精矿产品每年的氧化物,矿山寿命至少为10年。如果实现这一目标,将占该商品全球使用量的大约7%,使其跻身世界上最大的此类地雷之列。该分水岭矿床由犹他州开发公司于1978年发现,并在1985年之前被该公司广泛地勘探。据Vital董事长兼执行董事比尔·瑞安(Bill Ryan)称,犹他州放弃了该项目,主要是因为中国已经“淘汰了钨市场”。 1980年代中期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号