首页> 外文期刊>Metal Bulletin >Samancor Chrome closes two furnaces
【24h】

Samancor Chrome closes two furnaces

机译:Samancor Chrome关闭了两个熔炉

获取原文
获取原文并翻译 | 示例
           

摘要

South African ferro-alloys producer Samancor Chrome has decided to close two of its 20 MW furnaces, which have an installed capacity of 80,000 tpy of ferro-chrome.The decision was taken as a result of current market conditions and because the furnaces had developed signs of furnace lining failure, the company said. Delivery of new linings will take six to eight months during which time the furnaces will be examined and a decision taken as to whether they will be repaired or not. The company said there will be some restructuring in the operational framework relating to the furnaces.
机译:南非铁合金生产商Samancor Chrome已决定关闭其20 MW熔炉中的两个,这些熔炉的年产能为80,000吨铬铁。该公司表示,炉衬故障。新衬里的交付将需要六到八个月的时间,在此期间将对熔炉进行检查,并决定是否进行维修。该公司表示,与熔炉有关的运营框架将进行一些重组。

著录项

  • 来源
    《Metal Bulletin》 |2000年第8504期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 冶金工业;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号