首页> 外文期刊>Metal Architecture >Modern Education--Enclosing an existing school building with a new metal building creates a brand new school
【24h】

Modern Education--Enclosing an existing school building with a new metal building creates a brand new school

机译:现代教育-将现有的学校建筑与新的金属建筑封闭在一起,创建了一座全新的学校

获取原文
获取原文并翻译 | 示例
           

摘要

The project at Eimwood-Murdock Elementary School in Elmwood, Neb., is a unique one. Instead of bulldozing the original school and starting all over, the architects, Omaha, Neb.-based Archi+Etc LLC, enclosed the existing building with a new metal building and retrofit metal roofing infill system to create one entirely new facility. The two small towns' consolidated school board, superintendent, staff and community realized upfront that they could not sell a big enough bond issue to provide a new school for both towns. They knew they wanted to spend their very tight budget of 90 dollars per square foot wisely, by getting air conditioning, and upgraded security and technology, while increasing the number of classrooms and existing classroom size if possible, for both existing schools, explained Richard B. Hawks Jr., AIA, principal at Archi+Etc LLC.
机译:内布拉斯加州埃尔姆伍德市艾姆伍德-默多克小学的项目是一个独特的项目。总部位于内布拉斯加州奥马哈市的Archi + Etc LLC建筑师没有推翻原始学校,而是从头开始,而是用新的金属建筑封闭了现有建筑物,并翻新了金属屋顶填充系统,从而创建了一个全新的设施。两个小镇的合并学校董事会,总监,员工和社区意识到,他们无法出售足够多的债券来为两个小镇提供一所新学校。他们知道他们想通过购置空调,升级安全性和技术来明智地花费每平方英尺90美元的紧张预算,同时为两所现有学校增加教室的数量和现有教室的规模,Richard B解释说小鹰,友邦保险,Archi + Etc LLC负责人。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号