首页> 外文期刊>Foster Natural Gas Report >NATIONAL ENERGY BOARD OF CANADA ENSURES THAT TRANSCANADA'S INTERIM RATES GOVERN GAS TRANSPORTATION FOR REST OF 2011
【24h】

NATIONAL ENERGY BOARD OF CANADA ENSURES THAT TRANSCANADA'S INTERIM RATES GOVERN GAS TRANSPORTATION FOR REST OF 2011

机译:加拿大国家能源委员会确保跨加拿大的中间价在2011年剩余时间实现天然气运输

获取原文
获取原文并翻译 | 示例
           

摘要

Late last week, Canada's National Energy Board (NEB) chose to block any possibility of further rate adjustments in 2011 by rejecting the application of TransCanada PipeLines Ltd. last May that proposed a final rate structure that would have raised the pipeline's Eastern toll 21"/GJ to C$2.45/Gj, compared with its C$2.24/Gj interim toll. Its Southwest zone toll would be C$2.07/Gj, up 18 cents from the C$1.89 interim rate. The NEB was particularly critical of TransCanada’s plan to adjust for the difference between its proposed final and interim rates and have shippers pay that differential in future years. Nor is the Board persuaded that it should set aside the governing settlement "on the grounds of frustration, mutual mistake, or lack of full disclosure." The Board finds that these grounds do not apply for the reasons stated by TransCanada in its reply submissions.
机译:上周晚些时候,加拿大国家能源委员会(NEB)拒绝了在2011年进一步进行费率调整的任何可能性,去年5月拒绝了TransCanada PipeLines Ltd.的申请,该提议提出了最终费率结构,这将使该管道的东部通行费提高21“ / GJ为2.45加元/ Gj,相比之下,其临时通行费为2.24加元/ Gj;其西南地区的通行费为2.07加元/ Gj,比1.89加元的临时费率上涨了18美分。提议的最终费率和临时费率之间的差额,并要求托运人在未来几年内支付差额,委员会也没有说服它“以沮丧,相互错误或缺乏充分的披露为由”搁置理事和解。认定这些理由不适用于TransCanada在其答复中提出的理由。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号