...
首页> 外文期刊>Foster Natural Gas Report >Transco's Delta Lateral Project Would Serve New Power Plant in Pennsylvania; Rate Filing Implements Delivery Lateral Services
【24h】

Transco's Delta Lateral Project Would Serve New Power Plant in Pennsylvania; Rate Filing Implements Delivery Lateral Services

机译:Transco的Delta横向项目将为宾夕法尼亚州的新电厂提供服务;费率归档实施交付横向服务

获取原文
获取原文并翻译 | 示例
           

摘要

Transcontinental Gas Pipe Line Co. LLC (CP09-237) filed an application under Natural Gas Act (NGA) Section 7 to construct and operate a new delivery lateral that will extend from its mainline at Station 195 in York County, Pennsylvania, to the dual-fired (oil and gas) Delta Power Plant under construction in Peach Bottom Township, York County, to be owned and operated by Conectiv Mid Merit LLC (CMM). Transco will provide 208,800 dth/d of firm transportation service for Conectiv Energy Supply Inc. (Conectiv) under new incremental Rate Schedule FDLS for a primary term of 30 years. Transco executed a binding precedent agreement with Conectiv for 100% of project capacity.
机译:Transcontinental Gas Pipe Line Co. LLC(CP09-237)根据《天然气法》(NGA)第7节提交了一份申请,要求建造和运营一个新的输油管,该输油管将从其宾夕法尼亚州约克县195号站的干线延伸至双管。由Conectiv Mid Merit LLC(CMM)拥有和运营的在约克县Peach Bottom Township兴建的火(油气)三角洲发电厂。根据新的递增费率表FDLS,Transco将为Conectiv Energy Supply Inc.(Conectiv)提供208,800 d / d的公司运输服务,主要期限为30年。 Transco与Conectiv签订了具有​​约束力的先例协议,以100%的项目容量进行生产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号