首页> 外文学位 >Decision-making strategies used by California school districts' chief business officials in the selection of construction management services as a project delivery system for construction projects over five million dollars.
【24h】

Decision-making strategies used by California school districts' chief business officials in the selection of construction management services as a project delivery system for construction projects over five million dollars.

机译:加利福尼亚学区的主要业务官员在选择建筑管理服务时所使用的决策策略,作为超过500万美元的建筑项目的项目交付系统。

获取原文
获取原文并翻译 | 示例

摘要

Purpose. The four study purposes within selected K-12 public school districts with school construction projects funded by 1998 Proposition 1A General Bond funds were: (1) to describe criteria utilized by selected CBOs to obtain approval of CM as the project delivery system for school projects funded by 1998 1A General Bond funds; (2) to describe factors which support CM projects in selected districts; (3) to describe factors which hinder CM projects in selected districts; and (4) to describe methods used to measure outcomes of CM as a project delivery system for school construction projects in selected districts in four areas: (a) project delivery time; (b) desired level of quality; (c) project budget; and (d) project owner satisfaction.; Methodology. This study was descriptive. A questionnaire was developed to guide data collection. Each of the eight chief business officials who were purposively selected was interviewed. Qualitative methods were used for collecting and reporting results.; Findings. The key finding from the study suggest school districts select construction management services to: (1) control cost and bring project in within budget; (2) provide schedule flexibility to bring project in on time; (3) provide owner with shared construction management responsibility.; Conclusions. When responses were summarized, key findings resulted: there is no one preferred project delivery system. Study respondents recommend analysis of: (1) type of project, (2) size of project, (3) budget, (4) in-house knowledge and skills, and (5) completion timeline chief business officials used to select a project delivery system. With strong district administration support and continuous in-depth training programs, staffs acquire training and skills in order to: (1) explore available delivery options, (2) identify and communicate important role responsibilities, and (3) establish guidelines which successfully measure the outcomes.; Recommendations. As a result of the study, the researcher recommends ongoing training in the area of school construction management. Essential skills were deemed necessary in selecting an appropriate project delivery system.
机译:目的。由1998年提案1A普通债券基金资助的具有学校建设项目的K-12公立学区的四个学习目的是:(1)描述选定的CBO用于获得CM作为资助的学校项目的项目交付系统的标准。到1998年1A普通债券基金; (2)描述支持选定地区的CM项目的因素; (3)描述阻碍某些地区CM项目的因素; (4)描述用于衡量CM结果的方法,该方法是针对四个地区中选定地区的学校建设项目的项目交付系统:(a)项目交付时间; (b)期望的质量水平; (c)项目预算; (d)项目所有者的满意度。方法。这项研究是描述性的。编制了调查表以指导数据收集。故意选择的八位首席商务官均接受了采访。使用定性方法收集和报告结果。发现。研究的主要发现表明学区选择建筑管理服务以:(1)控制成本并将项目纳入预算之内; (2)提供进度灵活性以按时完成项目; (3)为业主承担共同的施工管理责任。结论。总结答复后,得出了主要结论:没有一个首选的项目交付系统。研究受访者建议对以下各项进行分析:(1)项目类型,(2)项目规模,(3)预算,(4)内部知识和技能,以及(5)完成时间线用于选择项目交付的首席业务官系统。借助强大的地区行政支持和持续的深入培训计划,员工将获得培训和技能,以:(1)探索可用的交付方式;(2)识别并传达重要的角色职责;(3)制定成功衡量指标的准则。结果。建议。研究的结果是,研究人员建议在学校建设管理领域进行持续培训。在选择合适的项目交付系统时,必须具备基本技能。

著录项

  • 作者

    Shell, Janet Ford.;

  • 作者单位

    University of La Verne.;

  • 授予单位 University of La Verne.;
  • 学科 Education Administration.; Education Secondary.; Education Business.
  • 学位 Ed.D.
  • 年度 2006
  • 页码 144 p.
  • 总页数 144
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 教育;中等教育;
  • 关键词

  • 入库时间 2022-08-17 11:40:34

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号