...
首页> 外文期刊>Foster Natural Gas Report >Commission Approves Texas Eastern’s TEAM 2014 Project and Denies All of ConocoPhillips’ Demands and Protests Regarding the Project
【24h】

Commission Approves Texas Eastern’s TEAM 2014 Project and Denies All of ConocoPhillips’ Demands and Protests Regarding the Project

机译:委员会批准了Texas Eastern的TEAM 2014项目,并拒绝了康菲石油公司对该项目的所有要求和抗议

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

On Feb. 11 the Commission issued a certificate to Texas Eastern Transmission LP (CP13-84) to construct its $520 million Texas Eastern Appalachia to Market 2014 (TEAM 2014) project, which consists of 33.6 miles of new 36-inch diameter pipeline loop and compression station upgrades designed to provide bidirectional flow along the company’s facilities1 and a total of 600,000 Dth/d of additional incremental transportation service to markets in the Northeast, Midwest, Southeast, and Gulf Coast (See FR Nos. 2939, pp30-34; 2947, pp12-15). The estimated total cost of the project is $519,736,638. The Commission also approved the pipeline’s related request to abandon compressor capacity as part of the upgrade to boost overall transmission capacity. Outright, the Commission denied ConocoPhillips’ request for an evidentiary hearing, denied the shipper’s 4/5/13 protest and the supplemental 1/28/14 pleading -- including its request for monetary restitution.
机译:2月11日,委员会向德克萨斯东部传输有限责任公司(CP13-84)颁发了证书,以建设其5.2亿美元的2014年德克萨斯东部阿巴拉契亚市场(TEAM 2014)项目,该项目包括33.6英里长的新36英寸直径管道环路和压缩站升级旨在在公司设施1上提供双向流动,并向东北,中西部,东南部和墨西哥湾沿岸的市场提供总计600,000 Dth / d的额外增量运输服务(请参阅FR No. 2939,pp30-34; 2947年) ,第12-15页)。该项目的估计总费用为519,736,638美元。欧盟委员会还批准了管道有关放弃压缩机容量的相关要求,作为升级计划的一部分,以提高整体传输能力。委员会直接拒绝了康菲石油公司进行的证据听证会的请求,拒绝了托运人的4/5/13抗议和补充的1/28/14诉状-包括其要求退款的请求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号