首页> 外文期刊>Foster Natural Gas Report >Tres Palacios Gas Storage Stands Firm on its Proposal to Reduce its Authorized Working Storage Capacity
【24h】

Tres Palacios Gas Storage Stands Firm on its Proposal to Reduce its Authorized Working Storage Capacity

机译:Tres Palacios储气库在减少其授权的工作储气量的建议上持坚定立场

获取原文
获取原文并翻译 | 示例
           

摘要

On Jan. 22 Tres Palacios Gas Storage LLC (TPGS) (CP14-27) filed both an answer to protests and an answer in opposition to a request to hold a proceeding in abeyance, defending its contested effort to reduce the authorized working natural gas capacity “on paper” at its underground natural gas storage facility in Markham, Texas. The storage company wants FERC to allow it to abandon up to 22.9 Bcf from a total certificated capacity of 57.26 Bcf of its underground working gas storage capacity, which would lower its operating costs and secure its economic viability, but also lower its payments to Underground Services Markham LLC1 (USM) and Riverway Storage Holdings, LLC2 (See FR No. 2984, pp21-23). USM and Riverway, protestors in the proceeding, charge that the abandonment request is “not based on actual demonstrated capabilities of the project, public safety concerns, or a meaningful abandonment of project capability.”
机译:1月22日,Tres Palacios储气有限公司(TPGS)(CP14-27)既提出抗议抗议,也提出反对,要求中止程序,以捍卫其减少授权天然气使用量的有力辩护。在德克萨斯州万锦市的地下天然气存储设施中“纸上写”。该存储公司希望FERC允许其从地下工作气体存储容量的57.26 Bcf的总认证容量中放弃最高22.9 Bcf,这将降低其运营成本并确保其经济可行性,同时也降低了其对Underground Services的付款Markham LLC1(USM)和Riverway Storage Holdings,LLC2(请参阅FR No.2984,第21-23页)。 USM和Riverway是该诉讼的抗议者,他们认为放弃请求“不是基于实际证明的项目能力,公共安全问题或有意义的项目能力放弃”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号