...
首页> 外文期刊>Foster Natural Gas Report >Mid-America Pipeline Responds to Complaint of Flint Hills That Rates for Movement of Heavy Liquids on Northern System Are Excessive and Should Correspond to Rates Charged for Propane
【24h】

Mid-America Pipeline Responds to Complaint of Flint Hills That Rates for Movement of Heavy Liquids on Northern System Are Excessive and Should Correspond to Rates Charged for Propane

机译:中美洲管道对弗林特希尔斯的投诉做出回应,因为弗林特希尔斯对北部系统中的重液移动速率过高,应与丙烷收费标准相对应

获取原文
获取原文并翻译 | 示例

摘要

Mid-America Pipeline Co., LLC (MAPL) recently responded to the complaint filed by Flint Hills Resources, LP (OR10-2) in November that challenges the justness and reasonableness of MAPL's rates for movements of butane, isobutane, natural gasoline, naphtha and refinery grade butane (collectively, "heavies") from Conway, Kansas to Pine Bend, Minnesota. The rates challenged by Flint Hills specifically involve movements of "heavies" from Conway to Pine Bend on the West Red Line of MAPL's Northern System. MAPL denied the allegations in the complaint and submitted that the complaint should be dismissed. MAPL answered that Flint Hills has failed to allege any reasonable ground for investigation of its rates, either its general commodity rates or seasonal discount rates for the movement of heavies. MAPL is wholly owned by Enterprise Products Partners LP. (FNGR No. 2771, pp25-26).
机译:中美洲管道有限公司(MAPL)最近对Flint Hills Resources,LP(OR10-2)于11月提出的投诉做出了回应,该投诉挑战了MAPL的丁烷,异丁烷,天然汽油,石脑油移动速率的合理性和合理性。和从堪萨斯州康威到明尼苏达州派恩本德的精炼级丁烷(统称“重油”)。弗林特·希尔斯(Flint Hills)挑战的利率特别涉及MAPL北部系统西红线上从康威(Conway)到派恩本德(Pine Bend)的“沉重”运动。 MAPL否认了申诉中的指控,并认为申诉应予驳回。 MAPL回答说,弗林特希尔斯(Flint Hills)未能为调查其费率提出合理的依据,无论是其一般商品费率还是重物移动的季节性折扣率。 MAPL由Enterprise Products Partners LP全资拥有。 (FNGR No.2771,第25-26页)。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号