...
首页> 外文期刊>Foster Natural Gas Report >ANR Pipeline’s Deferred Cost Adjustment Is Deferred Until Pending Year-Old Case Is Finally Disposed Of
【24h】

ANR Pipeline’s Deferred Cost Adjustment Is Deferred Until Pending Year-Old Case Is Finally Disposed Of

机译:ANR管道的递延成本调整被推迟到有待处理长达一年的案件最终解决之前

获取原文
获取原文并翻译 | 示例
           

摘要

On April 30 FERC rejected a primary proposal of ANR Pipeline Co. (RP14-650), submitted pursuant to the Deferred Transportation Cost Adjustment (DTCA) provisions of its tariff, to include certain unresolved contract costs that remain subject to the outcome of an ongoing rate proceeding in Docket No. RP13-743. The DTCA provisions requires ANR to make an annual filing to adjust its base transportation and storage rates by means of a surcharge if the actual Qualifying Transportation Costs incurred by ANR during a 12-month period ending on each April 30th vary by more than 10% from the Qualifying Transportation Costs included in its base rates.
机译:4月30日,FERC拒绝了ANR Pipeline Co.(RP14-650)根据其运价的延期运输成本调整(DTCA)条款提交的主要提案,其中包括某些未解决的合同成本,这些成本仍取决于正在进行的结果案卷号为RP13-743。 DTCA规定,如果ANR在每年4月30日止的12个月内发生的实际合格运输成本相差10%以上,则ANR需通过年度报告来通过附加费来调整其基本运输和仓储费率。基本费率中包含的合格运输费用。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号