...
首页> 外文期刊>Grain Journal >Two-Phase Project:NORTHERN ILLINOIS ELEVATOR ADDS STORAGE IN 2015 AND DRYER IN 2016
【24h】

Two-Phase Project:NORTHERN ILLINOIS ELEVATOR ADDS STORAGE IN 2015 AND DRYER IN 2016

机译:分两个阶段进行:2015年北伊利诺伊州电梯广告存储和2016年干燥机

获取原文
获取原文并翻译 | 示例
           

摘要

In mid-September, The DeLong Co., Inc. completed the second phase of a two-year project aimed at modernizing its nearly 45-year-old grain elevator in Waterman, IL.According to Kent Hamm, who has managed the Waterman facility since it was purchased in 2008 by The DeLongCo., there had not been any major renovations at the facility since the 1990s."We started to run out of storage space the past few years, and our old dryer has been around since the early '70s, so we were due," says Hamm, who also manages four other DeLong elevators in northern Illinois: Mi-nooka, Maple Park, Kirkland, and Cortland.
机译:据负责管理沃特曼工厂的肯特·哈姆姆(Kent Hamm)称,9月中旬,德隆有限公司(DeLong Co.,Inc.)完成了一个为期两年的项目的第二阶段,该项目旨在对其位于伊利诺伊州沃特曼的拥有近45年历史的谷物升降机进行现代化改造。自从DeLongCo。于2008年购买该设备以来,该设施自1990年代以来就没有进行过任何重大翻新。“过去几年,我们开始用尽了存储空间,而我们的老式干衣机从早期开始就存在了。 70年代,我们就该来了。”哈姆说,他还在伊利诺伊州北部经营着另外四辆DeLong电梯:米努卡,枫树公园,柯克兰和科特兰。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号