首页> 外文期刊>Gas Turbine World >The 40% solution for natural gas equivalence to make IGCC viable
【24h】

The 40% solution for natural gas equivalence to make IGCC viable

机译:使IGCC可行的40%天然气当量解决方案

获取原文
获取原文并翻译 | 示例
       

摘要

The focus on 90% carbon capture adds costs that will end up stalling commercial deployment of IGCC plants as well as PC plants for needed coal-based generation. Since my return from the 2007 Gasification Technologies Council conference in San Francisco I am still trying to assess how what I saw and heard will impact on the future for coal-based IGCC power generation and gasification projects. Foremost is that CO{sub}2 has become such an "all consuming" issue that we are back to "all talk and no action" for IGCC in the United States and that natural gas fired combined cycle will reign as the bridge technology for power generation while waiting on projects like FutureGen IGCC to show the way forward.
机译:将重点放在90%的碳捕集上会增加成本,最终将使IGCC电厂以及PC电厂的商业部署停滞不前,以实现所需的煤基发电。自从从2007年在旧金山举行的气化技术委员会会议返回后,我仍在尝试评估我所看到和听到的内容将如何影响煤基IGCC发电和气化项目的未来。最重要的是,CO {sub} 2已成为一个“全力以赴”的问题,以至于我们回到了IGCC在美国的“全力以赴,无所作为”,而天然气联合循环将成为电力的桥梁技术在等待诸如FutureGen IGCC之类的项目来展示前进之路时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号