首页> 外文期刊>GeoDrilling International >German mobile unit aids UK drive for greener power
【24h】

German mobile unit aids UK drive for greener power

机译:德国移动部门助力英国推动绿色动力

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

CONSTRUCTION of the largest offshore wind farm in UK coastal waters is under way in the East Irish Sea about 7 km southwest of Walney Island, near Barrow-in-Furness, northwest England. When complete, the Barrow offshore wind farm will comprise 30 Vestas V90-3.0 MW wind turbines and an offshore sub-station, covering an overall area of around 10 km~2. The wind farm will feed dean renewable energy into the UK's national grid at Heysham at an anticipated annual rate of production of 305 GWh and provide green electricity to around 65,000 homes.
机译:英国沿海水域最大的海上风电场的建设工作正在英格兰东部西北巴罗因弗内斯附近沃尔尼岛西南约7公里的东爱尔兰海中进行。完工后,巴罗海上风电场将包括30台Vestas V90-3.0 MW风力涡轮机和一个海上变电站,总面积约10 km〜2。该风电场将以Dean可再生能源向英国Heysham的国家电网供电,预计年产量为305 GWh,并为约65,000户家庭提供绿色电力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号