首页> 外文期刊>European Journal of Operational Research >A graph-oriented approach for the minimization of the number of late jobs for the parallel machines scheduling problem
【24h】

A graph-oriented approach for the minimization of the number of late jobs for the parallel machines scheduling problem

机译:一种面向图的方法,用于最大程度地减少并行机调度问题的延迟作业数量

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

An O(n(2)) algorithm is presented for the n jobs in parallel machines problem with identical processing times. Due dates for each job are given and the objective is the minimization of the number of late jobs. Preemption is permitted. The problem can be formulated as a maximum flow network model. The optimality proof as well as other properties and a complete example are given. (c) 2004 Elsevier B.V. All rights reserved.
机译:针对并行机器问题中的n个作业,提出了O(n(2))算法,处理时间相同。给出了每个工作的截止日期,目标是尽量减少后期工作的数量。允许抢占。该问题可以表述为最大流量网络模型。给出了最优性证明以及其他性质和一个完整的例子。 (c)2004 Elsevier B.V.保留所有权利。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号