...
首页> 外文期刊>Erdol Erdgas Kohle >Bovanenkovo pre-development in Yamal is on track
【24h】

Bovanenkovo pre-development in Yamal is on track

机译:Bovanenkovo在亚马尔的预开发工作如期进行

获取原文
获取原文并翻译 | 示例

摘要

Pre-development of the Bovanenkovo field, which will serve as the basis for establishing a new large gas production center on the Yamal Peninsula, is progressing on schedule. According to Gazprom much work has already been done at the comprehensive gas treatment unit (CGTU) module 1 and the booster compressor station. Equipment installation at the CGTU module 2 has been initiated. Flowlines and access roads to gas well clusters are being constructed. Gas production wells are being successfully drilled - 67 wells were drilled in 2010 with borehole equipment installed in 29 wells.
机译:Bovanenkovo气田的预开发正在按计划进行,这将作为在亚马尔半岛上建立新的大型天然气生产中心的基础。据俄罗斯天然气工业股份公司(Gazprom)称,综合气体处理装置(CGTU)模块1和增压压缩机站已经完成了许多工作。 CGTU模块2上的设备安装已启动。正在建设输气管线和通往气井群的通道。天然气生产井正在成功钻探-2010年钻探了67口井,并在29口井中安装了钻孔设备。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号