首页> 外文期刊>Engineering Geology >The observational method applied to a high embankment founded on sulphide clay
【24h】

The observational method applied to a high embankment founded on sulphide clay

机译:观测方法在基于硫化粘土的高路堤上的应用

获取原文
获取原文并翻译 | 示例
           

摘要

Since its introduction, Eurocode 7 has acknowledged the observational method as a valid design approach for geotechnical structures. The observational method is defined in five paragraphs. Although several case studies have concluded that the observational method is useful, the method is still sparsely used. This study compares the actual implementation of the observational method in the Veda embankment project according to the definitions given in Eurocode 7. The outcome of the observational method as a design approach, and the major deviations compared to the definitions in Eurocode 7 are discussed. It is concluded that the design of a multi-staged embankment, where the building process is governed by consolidation in the subsoil, can only partly be adapted to the observational method as defined in Eurocode 7. Furthermore, when this is the case, the possibility of combining "design by calculations" and the observational method is discussed.
机译:自推出以来,欧洲规范7已经将观测方法视为岩土结构的有效设计方法。观察方法定义为五个段落。尽管一些案例研究得出结论,观察方法是有用的,但仍很少使用该方法。本研究根据欧洲规范7中的定义比较了Veda路堤工程中观测方法的实际实施情况。讨论了观测方法作为一种设计方法的结果,以及与欧洲规范7中定义相比的主要偏差。结论是,多级路堤的设计只能通过部分地基固结来控制,其施工过程只能部分适应欧洲规范7中定义的观测方法。此外,在这种情况下,可能性很大。讨论了“通过计算设计”与观测方法相结合的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号