首页> 外文期刊>Engineering failure analysis >Failure analysis of tendon breakout on bottom slab of a pre-stressed concrete box gird bridge during construction
【24h】

Failure analysis of tendon breakout on bottom slab of a pre-stressed concrete box gird bridge during construction

机译:预应力混凝土箱梁桥底部平板腱断裂施工过程中的破坏分析

获取原文
获取原文并翻译 | 示例
           

摘要

There were several tendons breakout on bottom slabs happening during construction stage of continuous pre-stressed concrete bridges in recent years in China. The paper studies one case based on numerical simulation that happened on a 47+ 75 +47 m continuous pre-stressed concrete rigidframe bridge. In this paper, both linear elastic and nonlinear inelastic analysis are developed, concrete and reinforcements stress levels before and after pre-stressed tendons stressed are compared, and the path of crack appearance are revealed by calculation. The effects of the incorrect arrangement of reinforcement during construc tion are also analyzed, which is proved not to be the leading reason of the failure. The out comes of the finite element analysis indicate that oversize of the longitudinal prestressed tendons and unreasonable sizes of the bottom slab are the main reasons of the failure. Some advices to avoid similar accident are given for future design.
机译:近年来,在连续的预应力混凝土桥梁施工阶段,底板上出现了多次钢筋断裂。本文基于数值模拟研究了一个发生在47+ 75 +47 m连续预应力混凝土刚架桥上的案例。本文同时进行了线性弹性和非线性非弹性分析,比较了预应力筋应力作用前后混凝土和钢筋的应力水平,并通过计算揭示了裂缝出现的途径。还分析了在施工过程中钢筋布置不正确的影响,事实证明这不是造成破坏的主要原因。有限元分析的结果表明,纵向预应力筋的超大尺寸和底板的不合理尺寸是造成破坏的主要原因。对于将来的设计,提出了一些避免类似事故的建议。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号