...
首页> 外文期刊>Iron & Steel Review >'With the rolling of 120 m long rails, JSPL will be one of the producers of longest rail in the world'
【24h】

'With the rolling of 120 m long rails, JSPL will be one of the producers of longest rail in the world'

机译:“随着120 m长铁轨的滚动,JSPL将成为世界上最长铁轨的生产商之一”

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Santosh Mahanti: What is the current status of your rail project at your Raigarh works? What is the installed capacity of the Mill?V.K. Gujral: The installation of a State-of-the-Art Rail and Universal Beam Mill at Raigarh Works of JSPL is proceeding as per schedule and the project is in advanced stage of completion. The civil foundation and fabrication and erection of the building structure are complete to the extent of 90 per cent and 75 per cent respectively. The erection of the Reheating Furnace located at the head end of the mill in which the refractory lining work has commenced and it is expected that this work will be completed soon and the Furnace will be ready by middle of this year. The erection of the Mechanical Equipment and Electrical Equipment has commenced at the Breakdown Mill and is proceeding towards Intermediate, Roughing and Finishing Mill end. The 200T EOT Crane which is needed for the erection of the Mill Stands has been erected at the Mill Bay. This will accelerate the pace of erection work considerably.
机译:Santosh Mahanti:您在Raigarh的铁路项目的当前状态如何?磨机的装机容量是多少?古吉拉尔:JSPL的赖加尔工厂正在按计划进行最先进的铁路和万能束磨机的安装,该项目正处于完工阶段。土木基础,建筑结构的建造和安装分别达到90%和75%。位于轧机头端的耐火炉衬的安装已经开始,耐火衬里的工作已经开始,预计这项工作将很快完成,熔炉将在今年年中准备就绪。机械设备和电气设备的安装已经在分解工厂开始,并且正在进行中间,粗加工和精加工的结束。在磨坊湾架设了200T EOT起重机,用于架设机架。这将大大加快架设工作的步伐。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号