首页> 外文期刊>Energy World >Low head hydroelectric project in Yorkshire
【24h】

Low head hydroelectric project in Yorkshire

机译:约克郡的低水头水力发电项目

获取原文
获取原文并翻译 | 示例
       

摘要

A new 120 kW hydroelectric power plant, the largest plant commissioned in the UK in the last three years, has started generating electricity using the flow of the River Don in South Yorkshire. Located atThrybergh Weir near the village of Kilnhurst, five miles north-east of Rotherham, the hydropower scheme uses the flow of the River Don to power two large Archimedes screw turbines to generate renewable electricity. Developed by Barn Energy and Yorkshire Hydropower, the £2mn plant will generate electricity 24/7,10-11 months of the year, for the next 100 years, says Barn Energy.
机译:新的120 kW水力发电厂是过去三年中英国最大的水力发电厂,已开始利用南约克郡的唐河(River Don)发电。该水电计划位于罗瑟勒姆(Rotherham)东北五英里处基尔赫斯特(Kilnhurst)村附近的瑟里伯格堰(Thrybergh Weir),该水电计划利用唐河(River Don)的水流为两台大型阿基米德螺旋涡轮机提供动力,以产生可再生电力。谷仓能源公司说,由谷仓能源公司和约克郡水电公司共同开发的,耗资200万英镑的发电厂将在未来100年内每年24 / 7,10-11个月发电。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号