首页> 外文期刊>Engineering & Mining Journal >Eldorado Looks to Boost Kisladag Gold Output by 2011
【24h】

Eldorado Looks to Boost Kisladag Gold Output by 2011

机译:Eldorado希望在2011年之前提高Kisladag的黄金产量

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Eldorado Gold Corp. has released a summary of the results of a recently completed internal review of its Kisladag project in western Turkey. The study, according to the company, identified certain opportunities to effectively increase annual production and lower unit costs at Kisladag and will form the basis of feasibility engineering to be undertaken by the company and its consultants over the next five months. Highlights of the study included the potential to increase planned production by 30 percent to 40 percent , an opportunity to lower unit operating costs by approximately 15 percent , the ability to accelerate recovery of in-heap gold inventory, capital investment requirements of approximately 45 million dollars, and an implementation schedule that could result in a production increase commencing in 2011.
机译:Eldorado Gold Corp.已发布了对土耳其西部Kisladag项目最近完成的内部审查结果的摘要。据该公司称,该研究确定了在Kisladag有效提高年产量和降低单位成本的某些机会,并将成为该公司及其顾问在未来五个月中进行可行性工程的基础。该研究的重点包括将计划产量提高30%至40%的潜力,将单位运营成本降低约15%的机会,加速堆内金库存恢复的能力,资本投资要求约4500万美元,以及可能导致从2011年开始增加产量的实施时间表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号