...
首页> 外文期刊>Energy Argus petroleum coke >Power crisis exposes threat to PdV core operations
【24h】

Power crisis exposes threat to PdV core operations

机译:电力危机暴露了对PdV核心运营的威胁

获取原文
获取原文并翻译 | 示例
           

摘要

Venezuelan state-owned PdV’s operations will suffer significant disruptions and potential structural damage if a prolonged drought forces state-owned utility Corpoelec to idle up to 6GW of hydropower generation capacity this month. Corpoelec’s operational capacity could drop from about 17GW to as low as 11GW if the strategic Guri reservoir’s water level drops below 240m above sea level, triggering security protocols that could shut down up to eight turbines at the 10GW Simon Bolivar hydroelectric complex on the Lower Caroni River in Bolivar state. The reservoir is at around 241.6 masl, with some recent rainfall stabilizing the level. Guri normally accounts for over 60pc of Venezuelan power supply.
机译:如果长期干旱迫使国有公用事业公司Corpoelec本月闲置高达6GW的水力发电能力,则委内瑞拉国有PdV的运营将遭受重大破坏,并可能遭受结构性破坏。如果战略古里水库的水位下降到海拔240m以下,Corpoelec的运营能力可能会从约17GW降至11GW,从而触发安全协议,从而可能关闭下卡罗尼河上10GW西蒙·玻利瓦尔水电站的八台涡轮机在玻利瓦尔州。该水库的水位约为241.6 masl,近期降雨使水位稳定。 Guri通常占委内瑞拉电源的60%以上。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号