首页> 外文期刊>Energy Argus petroleum coke >Tough talks at Cerrejon mine increase strike risk
【24h】

Tough talks at Cerrejon mine increase strike risk

机译:塞雷洪矿山的艰难谈判增加了罢工风险

获取原文
获取原文并翻译 | 示例
           

摘要

Negotiations between Colombia’s largest coal mine, Cerrejon, and its main union have gone almost a month without a resolution, increasing the likelihood of a strike. The Sintracarbon union has refused to back off from its demands. The company says that, because of falling coal prices, it has no option other than to reduce wages and cut benefits, Sintracarbon's national vice-president Orlando Cuello said. Sintracarbon and Cerrejon completed the first 20 days of direct negotiations on 1 February and began a second phase — an additional 20 days — on 2 February. Negotiations are being held in the coastal city of Barranquilla.
机译:哥伦比亚最大的煤矿塞雷洪(Cerrejon)与其主要工会之间的谈判已经进行了将近一个月而没有解决方案,这增加了发生罢工的可能性。辛特拉碳工会拒绝放弃其要求。该公司表示,由于煤炭价格下跌,Sintracarbon的国家副总裁奥兰多·库洛(Orlando Cuello)说,除了降低工资和削减福利外,别无选择。 Sintracarbon和Cerrejon于2月1日完成了直接谈判的前20天,并于2月2日开始了第二阶段-再延长20天。谈判正在沿海城市巴兰基亚举行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号