Partner Valiant Petroleum says plans for the development of the UK North Sea Crawford field in Block 9/28a are moving ahead quickly through the conceptual phase and will shortly be into the front-end engineering and design phase.Reservoir modeling and simulation work is nearly complete and the field partners,led by operator Fairfield Acer say they are encouraged by the results to date.
展开▼