Reliability Analysis of an Identical Two-Unit Parallel CC Plant System Operative with Full Installed Capacity

机译:具有相同装机容量的两机并联CC工厂系统的可靠性分析

获取原文
获取原文并翻译 | 示例
       

摘要

The paper presents a reliability analysis of an identical two-unit parallel CC plant system. Each unit consists of two identical 150 ton electrically operated overhead travelling (EOT) cranes operative at fully installed capacity. Failure in any crane of a unit brings the unit to a complete halt, and the inspection is carried out to detect the type of failure. Four years maintenance data from a steel production plant have been used for this purpose. Three major failures were noted in the system, viz., repairable, replaceable, and reconditioning/reinstallation. The real failure situations as depicted in the data have been considered for analysis. Optimized reliability indices of the system effectiveness are estimated numerically by using semi-Markov processes and regenerative point techniques.
机译:本文介绍了相同的两单元并联CC工厂系统的可靠性分析。每个单元均由两台相同的150吨电动全天桥(EOT)起重机组成,这些起重机在完全安装的情况下运转。任何单元起重机的故障都会使该单元完全停止,并进行检查以检测故障类型。为此,使用了钢铁生产厂的四年维护数据。系统中记录了三个主要故障,即可修复,可更换和重新安装/重新安装。数据中描述的实际故障情况已被考虑进行分析。通过使用半马尔可夫过程和再生点技术对系统有效性的最佳可靠性指标进行了数值估算。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号