...
首页> 外文期刊>Asia Oil and Gas Newsletter >Sino’s Sanjiaobei progress
【24h】

Sino’s Sanjiaobei progress

机译:sino’苏San脚背progress

获取原文
获取原文并翻译 | 示例
           

摘要

Sino Gas & Energy reports that field operations are well underway and the second compressor at the Sanjiaobei central gathering station in the Sanjiaobei Production Sharing Contract (PSC) in the Ordos Basin in China’s Shaanxi Province has been brought onstream. This has increased capacity from 113.3-226.6 Mcm/d (4-8 MMcf/d) to around 170.0 Mcm/d (6 MMcf/d), with 13 wells onstream from the pool of 16 wells. “New wells that have been brought online to fill the additional capacity are currently choked back and will gradually be opened up as flow rates stabilise,” Sino said.
机译:《中国天然气与能源》报道说,现场作业进展顺利,位于中国陕西省鄂尔多斯盆地的三交北生产分成合同(PSC)的三交北中央集散站的第二台压缩机已投入生产。这已将产能从113.3-226.6 Mcm / d(4-8 MMcf / d)增加到约170.0 Mcm / d(6 MMcf / d),从16口井的池中新增了13口井。信和称:“已经投入使用以填补额外产能的新井目前正在被堵塞,随着流量的稳定,它将逐步开放。”

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号