...
首页> 外文期刊>Asia Oil and Gas Newsletter >Thailand Manora progress
【24h】

Thailand Manora progress

机译:泰国Manora进展

获取原文
获取原文并翻译 | 示例
           

摘要

Tap Oil reports that all 11 development wells have been completed on the Manora oil development project in the northern Gulf of Thailand. The drilling rig has now moved off location. Manora is producing from six wells: MNA-01, MNA-02, MNA-03, MNA-05, MNA-07 and MNA-08, with MNA-11 expected to start production this week. Manora has been producing above 15,000 b/d of oil (gross), and on occasion above 16,000 b/d (gross) since the six wells have been in production.
机译:Tap Oil报告说,泰国北部北部的Manora石油开发项目已全部完成11口开发井的建造。钻机现已移出位置。 Manora从6口井生产:MNA-01,MNA-02,MNA-03,MNA-05,MNA-07和MNA-08,预计MNA-11将于本周开始生产。自从六口井开始生产以来,马诺拉的石油日产量超过15,000桶/日,有时甚至超过16,000桶。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号