【24h】

Estimation of Production Forgone

机译:放弃产量的估计

获取原文

摘要

Three methods for estimating production forgone were compared by assessing the effects of power plant entrainment and impingement on gizzard shadDorosoma cepedianumin western Lake Erie. The three approaches evaluated were (1) the Rago (1984) method, which is a direct method based on exponential mortality and growth, (2) a continuous-time direct method based on exponential mortality and the von Bertalanffy growth equation, and (3) an indirect method, based on exponential mortality and the von Bertalanffy growth equation, in which production forgone was calculated as the difference between population production with and without an environmental disturbance. The indirect method gives a measure of the relative effect of the power plant-induced mortality and production, but requires estimation of recruitment, which is difficult to estimate. An initial estimate of production forgone by the direct approach of Rago (1984), which does not require an estimate of recruitment, can be used to estimate recruitment for the indirect estimate of production forgone; together, the direct and indirect approaches give a more complete assessment of production forgone. A sensitivity analysis showed production forgone was sensitive to changes in mortality rates of larvae, young of the year, and juveniles and to change in the asymptotic weight of adults.
机译:通过评估电厂夹带和撞击对伊利湖西部鲥鱼Dorosoma cepedianumin的影响,比较了三种估算产量损失的方法。评估的三种方法是:(1)Rago(1984)方法,这是一种基于指数死亡率和增长的直接方法,(2)一种基于指数死亡率和von Bertalanffy增长方程的连续时间直接方法,以及(3)一种基于指数死亡率和von Bertalanffy增长方程的间接方法,其中放弃的生产被计算为有和没有环境干扰的人口生产之间的差异。间接法可以衡量电厂引起的死亡率和产量的相对影响,但需要估计招募量,这很难估计。Rago(1984)的直接方法对放弃的产量的初步估计不需要对招募进行估计,可用于对放弃的产量的间接估计来估计招募;总之,直接和间接方法可以更全面地评估生产放弃。敏感性分析显示,放弃的产量对幼虫、当年幼鱼和幼鱼死亡率的变化以及成虫渐近体重的变化敏感。

著录项

获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号