首页> 外文期刊>Arab Oil & Gas Magazine >Saudi Aramco to Install CO2 Injection Facilities with a Capacity of 40 Million Cu Ft/Day at the Super-Giant Ghawar Field
【24h】

Saudi Aramco to Install CO2 Injection Facilities with a Capacity of 40 Million Cu Ft/Day at the Super-Giant Ghawar Field

机译:沙特阿美将在超巨型Ghawar油田安装日产4000万立方英尺的二氧化碳注入设施

获取原文
获取原文并翻译 | 示例
           

摘要

Saudi Aramco intends to start injecting carbon dioxide (CO2) into the super-giant Ghawar oil field in 2012, according to Mr. Muhammed al-Sabban, the head of the Saudi delegation to the United Nations negotiations on climate change and an advisor to the Ministry of Petroleum. The Ghawar field produced some 5 million b/d of crude in 2008, accounting for over half the country's total output. Quoted by Reuters, Mr. al-Sabban said this was a major pilot project that was aimed at reducing or capturing carbon emissions.
机译:联合国气候变化谈判沙特代表团团长,联合国气候变化问题顾问穆罕默德·萨班(Muhammed al-Sabban)先生说,沙特阿美计划在2012年开始向超大型的Ghawar油田注入二氧化碳(CO2)。石油部。 2008年,Ghawar油田的原油产量约为500万桶/天,占该国总产量的一半以上。路透社援引al-Sabban先生的话说,这是一个旨在减少或捕获碳排放的大型试点项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号