首页> 外文期刊>Arab Oil & Gas Magazine >Offshore Al-Theka Gas Field Brought into Production at a Rate of 95 Million Cu Ft/Day
【24h】

Offshore Al-Theka Gas Field Brought into Production at a Rate of 95 Million Cu Ft/Day

机译:海上Al-Theka气田以9500万立方英尺/日的速度投入生产

获取原文
获取原文并翻译 | 示例
           

摘要

The al-Theka gas field, located in a zone of the Mediterranean of the same name, was brought into production at the end of January at a rate of 95 million cu ft/day of gas, and all its output is being fed into the national gas grid. The tract is held by Tharwa Petroleum in association with IEOC, the local subsidiary of the Italian company Eni.
机译:1月底,位于地中海一个同名区域的al-Theka气田以9500万立方英尺/天的天然气产量投入生产,其所有产出都被输送到国家燃气网。该管道由塔尔瓦石油公司与意大利Eni公司的当地子公司IEOC联合持有。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号