首页> 外文期刊>Arab Oil & Gas >Nine Companies Invited to Bid by May for the Construction of the Shuaiba North Power and Water Complex
【24h】

Nine Companies Invited to Bid by May for the Construction of the Shuaiba North Power and Water Complex

机译:九月份将邀请九家公司竞标建设帅巴北部水电枢纽

获取原文
获取原文并翻译 | 示例
           

摘要

At the request of the Energy Ministry,the Central Tenders Committee (CTC) has invited nine companies to submit bids by 7 May for the EPC (engineering,procurement and construction) contract for the Shuaiba North power and water cogeneration station,according to the local newspaper al-Qabas.The complex is due to have a capacity of 500 MW of electricity and 60 million gallons/day of potable water.
机译:应能源部的要求,中央招标委员会(CTC)已邀请9家公司于5月7日前投标获得Shubaba North电力和水热电联产站的EPC(工程,采购和建设)合同该基地将拥有500兆瓦的电力和每天6000万加仑的饮用水。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号