【24h】

Early planning is key

机译:早期规划是关键

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Early supplier involvement and use of pre-fitted security kiosks has delivered programme benefits in the upgrade of pumping stations on Wessex Water's integrated water supply grid. The £230M Water Supply Grid, Wessex Water's largest mains water project to date, will improve security of water supply to customers and increase network resilience to flooding and other emergency events. The eight-year scheme commenced in 2010 and includes constructing more than 150km of trunk mains, 14 new service reservoirs and 22 new or refurbished pumping stations across Somerset, Wiltshire and Dorset. It will join up a significant part of the Wessex network from the north of Bournemouth, via Salisbury, to Bath. The grid's engineering design, planning and environmental services are being undertaken by WECS, Atkins and AECOM.
机译:供应商早期参与和pre-fitted的使用保安亭了计划的好处威塞克斯在泵站的升级水的综合供水网格。水供应网格,Wessex Water最大的电源水项目,将提高安全性水供应给客户,增加网络弹性洪水和其他紧急情况事件。,包括建设150多公里箱电源,14个新的服务水库和22或翻新泵站在萨默塞特郡威尔特郡和多塞特。威塞克斯网络的重要组成部分伯恩茅斯以北,通过索尔兹伯里,浴。网格的工程设计、规划和环境服务正在进行wec,阿特金斯和艾奕康科技。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号