...
首页> 外文期刊>Energy Argus petroleum coke >Miro refnery turnaround to cut diesel output
【24h】

Miro refnery turnaround to cut diesel output

机译:Miro炼油厂转机切割柴油输出

获取原文
获取原文并翻译 | 示例
           

摘要

The 301,000 b/d Miro refnery at Karlsruhe in southwest Ger- many will shut down its plant section 1 in mid-February for maintenance and modernisation work until the end of March. The afected units account for 60-70pc of the refnery’s capacity and primarily produce diesel. Overall production is curtailed by about 50pc as of this week, as Miro shut down the frst key units from 13 February as part of maintenance and major inspections. The major part of the facilities will follow in stages over the following two weeks.
机译:位于德国西南部卡尔斯鲁厄(Karlsruhe)的日产量为301000桶的米罗餐厅(Miro refnery)——许多餐厅将于2月中旬关闭其1号厂区,以便进行维护和现代化工作,直到3月底。受影响的单元占餐厅容量的60-70%,主要生产柴油。作为维护和主要检查的一部分,米罗从2月13日起关闭了第一批关键机组,截至本周,总产量减少了约50%。设施的主要部分将在接下来的两周内分阶段进行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号