首页> 外文期刊>European Journal of Industrial Engineering >Project management under uncertainty: using flexible resource management to exploit schedule flexibility
【24h】

Project management under uncertainty: using flexible resource management to exploit schedule flexibility

机译:项目管理下的不确定性:使用灵活的资源管理利用计划灵活性

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

Project management still faces a wide gap separating theory from practice, especially regarding the robustness of the generated project schedules facing the omnipresence of uncertainty. A new approach to deal with uncertainty is presented to explore slack that might exist in a given project schedule. We propose that renewable resources' capacity to perform work can be increased so that they can perform additional work in a time unit or can be decreased with the consequent reduction on the performed work. This possibility combined with the slack that some activities have in a specific schedule can be used to absorb deviations that might occur during a project's execution. When a critical activity is about to have its duration increased, slowing down other non-critical activities by putting their resources in a decreased work mode enables the activity to still be executed within time by using resources in an increased working mode. [Received: 14 February 2018; Revised: 2 January 2019; Revised: 8 June 2019; Accepted: 17 November 2019]
机译:None

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号