首页> 外文期刊>地震学报(英文版) >Resource management and job scheduling of China earthquake grid experiment system:Construction of resource management and job dynamic scheduling model ProRMJS
【24h】

Resource management and job scheduling of China earthquake grid experiment system:Construction of resource management and job dynamic scheduling model ProRMJS

机译:中国地震网格实验系统资源管理与作业调度:资源管理与作业动态调度模型ProRMJS的构建

获取原文
获取原文并翻译 | 示例
       

摘要

Grid technique is taken as the third generation intemet technology and resource management is the core of it.Aiming at the problems of resource management of CEDAGrid (China Earthquake Disaster Alleviation and Simulation Grid) in its preliminary construction, this paper presents a resource management and job scheduling model:ProRMJS to solve these problems. For platform supposed agreeably each computing node can provide computation service, ProRMJS uses "computation pool" to support scheduler, and then the scheduler allocates jobs dynamically according to computing capability and status of each node to ensure the stability of the platform. At the same time, ProRMJS monitors the status of job on each node and sets a time threshold to manage the job scheduling. By estimating the computing capability of each node, ProRMJS allocates jobs on demand to solve the problem of supposing each node can finish the job acquiescently. When calculating the computing capability of each node,ProRMJS allows for the various factors that affect the computing capability and then the efficiency of the platform is improved. Finally the validity of the model is verified by an example.
机译:以网格技术为第三代互联网技术,其核心是资源管理。针对中国地震减灾与仿真网格CEDAGrid在其初步建设中的资源管理问题,提出了资源管理与工作调度模型:ProRMJS解决这些问题。对于假定一致的每个计算节点可以提供计算服务的平台,ProRMJS使用“计算池”来支持调度程序,然后调度程序根据每个节点的计算能力和状态动态分配作业,以确保平台的稳定性。同时,ProRMJS监视每个节点上的作业状态,并设置时间阈值来管理作业调度。通过估计每个节点的计算能力,ProRMJS按需分配作业,以解决假定每个节点可以默认完成作业的问题。在计算每个节点的计算能力时,ProRMJS考虑了影响计算能力的各种因素,从而提高了平台的效率。最后通过实例验证了模型的有效性。

著录项

  • 来源
    《地震学报(英文版)》 |2006年第6期|695-703|共9页
  • 作者单位

    China Earthquake Networks Center, Beijing 100036, China;

    China Earthquake Networks Center, Beijing 100036, China;

    Institute of Computing Technology, Chinese Academy of Sciences, Beijing 100080, China;

    China Earthquake Networks Center, Beijing 100036, China;

    China Earthquake Networks Center, Beijing 100036, China;

    China Earthquake Networks Center, Beijing 100036, China;

    The Second Academy of China-Aerospace Science and Industry Corporation, Beijing 100854, China;

    The Second Academy of China-Aerospace Science and Industry Corporation, Beijing 100854, China;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 chi
  • 中图分类 计算机网络;
  • 关键词

    grid computing; earthquake grid; resource management; job allocation;

    机译:网格计算;地震网格;资源管理;职位分配;
  • 入库时间 2022-08-19 03:55:23
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号